BEPC led validation and qualification support for a legacy SCADA migration, preserving validated operations while enabling standard architecture, reporting, and future MES integration.

0
Production continuity interruptions during migration
MES
Future integration path enabled through standard SCADA platform
DHR
Reporting infrastructure qualified for compliant archive support
The existing Rockwell SCADA platform had reached end of life and needed migration to a global standard while preserving validated manufacturing operations, maintaining compliant reporting, and preparing for future MES integration.
BEPC provided project management, validation engineering, commissioning support, software validation planning, SCADA qualification, stakeholder coordination, and support for commissioning activities.
The team combined validation planning, integration qualification, reporting verification, and stakeholder coordination to create a controlled migration path from legacy SCADA to a global standard architecture.
The program established a validated migration path toward a standard SCADA architecture, improved long-term digital manufacturing readiness, and enabled future MES integration while maintaining compliance and operational continuity.
Metric
Business continuity
Baseline
Legacy SCADA platform required migration
Result
Continuity maintained
Change
Controlled migration path
Why it matters
Protected validated manufacturing operations
Metric
Digital manufacturing readiness
Baseline
End-of-life platform
Result
Global SCADA standard path enabled
Change
Future MES integration supported
Why it matters
Improves long-term architecture alignment
Metric
Reporting infrastructure
Baseline
Reporting capability required qualification
Result
Read-only SCADA objects and reporting infrastructure qualified
Change
DHR archive support enabled
Why it matters
Supports compliant manufacturing records


“BEPC gave us a validated path to a standard SCADA architecture without putting daily operations at risk. We came out of the program compliant, better positioned for MES integration, and with a digital roadmap our engineers actually trust.”Director of Digital Manufacturing - Global medical-device manufacturer (name withheld)
Partners & standards
Rockwell AutomationGlobal SCADA teamSystem integratorMaximoSoftware validation planning
Last reviewed: July 2026
Talk to our expert about a similar validation or CQV challenge. Client details anonymized for confidentiality.

Preparing an Enlabel V24 upgrade for regulated manufacturing
100% - QA-environment testing completed

Automating leak testing with a validated collaborative robot
50% - Workstation workload reduced

Replicating US suture manufacturing across a global supply chain
4 - Countries coordinated
Next project
Designing an AI-native PMO operating model
Data Centers & Networking / Industrial Technology
Read case study
Download this case study
Choose the format you need and export in one click.