CASE STUDY
BEPC led validation planning and readiness for an Enlabel V24 upgrade, coordinating server migration, security assessment, test execution, and production implementation preparation.

100%
QA-environment testing completed
0
Major issues during server migration and print-client installation
V24
Upgrade release prepared for production implementation
A production-critical labeling application needed to be upgraded and moved to cloud servers without disrupting manufacturing. The project required dry runs, validation documentation, security review, and coordination across technology, quality, database, local IT, manufacturing, and vendor teams.
BEPC authored validation deliverables, coordinated validation activities, maintained vendor and department communication, led project meetings, and resolved implementation issues across the regulated software lifecycle.
The team validated the upgrade in the QA environment first, addressed test findings, coordinated server and print-client readiness, and held production implementation until database migration prerequisites were complete.
Enlabel V24 testing was completed successfully in the QA environment. Server migration and print-client installation activities were completed with no major issues, and all testing findings were addressed. Production implementation remains pending until the database team completes required server migration preparation.
Metric
QA validation testing
Baseline
Upgrade required before production release
Result
Completed successfully
Change
100% QA testing completed
Why it matters
Established readiness before production implementation
Metric
Migration readiness
Baseline
Application and data servers on legacy infrastructure
Result
Server migration and print-client installation completed with no major issues
Change
Controlled readiness milestone
Why it matters
Reduced production cutover risk
Metric
Production implementation
Baseline
Legacy Enlabel environment
Result
Pending database migration preparation
Change
Ready for final prerequisite completion
Why it matters
Keeps release honest and controlled


“Labeling touches every product we ship, so the V24 upgrade had zero room for error. BEPC's validation deliverables and vendor coordination got us through QA testing and server migration with no major issues — exactly the controlled change we needed.”Site Quality Systems Manager - Regulated medical-device manufacturing site (name withheld)
Partners & standards
Site manufacturingInfrastructure & cloud servicesDatabase servicesTechnology qualityLocal ITEnlabel vendor team
Last reviewed: July 2026
Talk to our expert about a similar infrastructure program. Client details anonymized for confidentiality.

Validating a SCADA migration for manufacturing operations
0 - Production continuity interruptions during migration

Migrating a production IVU monitoring system without manufacturing disruption
0 - Production interruptions during migration

Automating leak testing with a validated collaborative robot
50% - Workstation workload reduced
Next project
Validating an electrophysiology catheter line to increase capacity
Medical Devices - Cardiovascular
Read case study
Download this case study
Choose the format you need and export in one click.