18,000rows
Manual spreadsheet process replaced
CASE STUDY
BEPC designed and built ARMS, a web-based audit scheduling platform that replaced a manual 18,000-row spreadsheet process with centralized, role-based coordination.

18,000rows
Manual spreadsheet process replaced
30%
Reduction in missed audits during annual scheduling
180+days
Manual annual scheduling effort eliminated
Supplier audit scheduling was managed through a single 18,000-row spreadsheet emailed across auditors and coordinators. Individual updates had to be reconciled into one master file, creating version conflicts, coordination errors, regulatory reporting risk, and unnecessary information-security exposure.
BEPC delivered the full ARMS platform from design through development, testing, launch support, hypercare, and ongoing module enhancements requested by the client.
The team moved the client from a temporary SharePoint workaround into a purpose-built application, validating workflows with pilot users before release and continuing support through bug fixes and new modules.
ARMS replaced the spreadsheet-driven audit scheduling process with one centralized platform. Auditors and coordinators now work from controlled role-based views, reducing missed audits, eliminating annual manual consolidation effort, and lowering information-security risk.
Metric
Scheduling source of truth
Baseline
18,000-row spreadsheet
Result
Centralized ARMS platform
Change
Single controlled system
Why it matters
Reduced version conflicts and reconciliation errors
Metric
Missed audits
Baseline
Manual annual schedule development
Result
30% reduction
Change
Improved schedule adherence
Why it matters
Lower compliance and reporting risk
Metric
Annual schedule effort
Baseline
180+ manual man-days
Result
Eliminated
Change
Automated coordination workflow
Why it matters
Freed teams from spreadsheet consolidation work


“ARMS took our audit program out of spreadsheets and gave every auditor and coordinator one controlled view of the schedule. Missed audits dropped, the annual consolidation exercise disappeared, and BEPC stayed through hypercare until the platform ran itself.”Director of Supplier Quality - Global life-sciences manufacturer (name withheld)
Partners & standards
MERN stackAgile / SCRUMSupplier audit operationsHypercare support
Last reviewed: July 2026
Talk to us about a similar supplier quality project. Client details anonymized for confidentiality.

Designing an AI-native PMO operating model
92% - Labor reduction demonstrated for manual PERM screening

Automating leak testing with a validated collaborative robot
50% - Workstation workload reduced

Building a global supplier-audit compliance partnership
Global - Supplier audit process harmonized across regions
Next project
Migrating a production IVU monitoring system without manufacturing disruption
Medical Devices / Healthcare Manufacturing
Read case study
Download this case study
Choose the format you need and export in one click.